Ready for a quote? Schedule an Estimate
  • Shopping Cart Shopping Cart
    0Shopping Cart
American Scaffolding
Counterweight Calculators
  • Link to Facebook
  • Home
  • About Us
  • Products
    • Systems Scaffold
    • Frame Scaffolding
    • Shoring Scaffolds
    • Indy Scaffolds
    • Swing Stage Scaffolding
    • Trash Chutes
    • Mast Climbers
    • Material Hoist
    • Ladders
    • Safety Equipment
    • Transport Platforms
    • Safety Handrail & Fencing
    • Public Access Stair Systems & Ramps
  • Services
    • Erection and Dismantle
    • Servicing Equipment
    • Safety Training
    • Engineering
    • Davit and Anchor Systems
  • Wire Rope
  • Scaffolding News
  • Careers
    • Career Overview
    • Benefits
    • Job Openings
    • Application for Employment
  • Contact Us
    • Contact Us
    • Request A Quote
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Swing Stage Scaffolding Riverside Methodist Hospital

Riverside Methodist Hospital Columbus, Ohio

Customer Stories

Client: Pioneer Cladding and Glazing

Location: Columbus, Ohio

Job Type: Panel Installation

Scaffold Type: Two Tier Swing Stage and 45° Corner Swing Stage

 

Riverside Methodist Hospital was originally founded on June 2, 1892 as the Protestant Hospital. Riverside Methodist Hospital is the largest member hospital in the OhioHealth group. The hospital is not-for-profit hospital and is faith based. Riverside Methodist has several specialty centers and services within the hospital, including Neuroscience and Stroke, Heart and Vascular, Maternity and Women’s Health, Cancer Care, Trauma Center II, Hand and Microvascular, Surgery and Minimally Invasive Surgeries, Orthopedics, Imaging, and Bariatric Surgery.

American Scaffolding, Inc. was selected by Pioneer Cladding and Glazing to design a two tier swing stage and 45° corner swing stage. Challenges included creating a semi rigid connection between the two swing stages. This was quickly overcome by collaborating with Bee Access to design a cable system that allows both stages to have a direct connection but still allowing some independent movement. Other hurdles in the project included building 20 ft. scaffolding towers in order to assemble the swing stage platform over the existing air handling units. American Scaffolding, Inc. would like to thank Bee Access for the great customer service with the design process and Pioneer Cladding and Glazing for allowing American Scaffolding, Inc the opportunity to design and build this unique swing stage application. 

https://amscaf.com/wp-content/uploads/2017/05/IMG_1385.jpg 800 600 Spencer Stroube https://amscaf.com/wp-content/uploads/2017/07/American-Scaffolding-Logo-2.jpg Spencer Stroube2015-03-23 15:53:012023-04-21 11:19:07Riverside Methodist Hospital Columbus, Ohio

Categories

  • Current Jobs
  • Customer Stories
  • Safety
  • Scaffolding & Equipment
  • Uncategorized

Most Recent Posts

  • Scaffolding Safety: It is ALWAYS our Priority
  • Can You Imagine: Over 70,000 Pieces of Scaffolding?
  • Safety Training: It’s in American Scaffolding DNA

Need Scaffolding? Get A Quote!

Schedule an Estimate

Contact Us

American Scaffolding, Inc.
7161 Eagle Creek Rd
Cincinnati, Ohio 45247
(513) 353-1181

6599 Granger Rd.
Independence, Ohio 44131
(216) 524-7733

Follow Us

  • Facebook

Links

  • Home
  • About Us
  • Scaffolding
  • Literature/Forms
  • Contact Us

Memberships

Allied Construction
Scaffold Access Industry

American Scaffolding Logo

© 2025 American Scaffolding, Inc.

Link to: Princeton High School Cincinnati, Ohio Link to: Princeton High School Cincinnati, Ohio Princeton High School Cincinnati, OhioFrame Scaffolding Princeton-High-School-Frame-Dance-Floor-Cincinnati,-Ohio Link to: American Scaffolding and Cincinnati’s Historic Union Terminal Link to: American Scaffolding and Cincinnati’s Historic Union Terminal The unique ceiling of Union Terminal in CincinnatiAmerican Scaffolding and Cincinnati’s Historic Union Terminal
Scroll to top Scroll to top Scroll to top